FirstICE / Gel-Pack Manufacturing Insourcing & Cost-Reduction Program

A make-versus-buy manufacturing program that brought cryotherapy gel-pack capability in-house and materially changed the economics of a core product platform.

Results

Results and contributions.

01$2.20 → $0.40The historical make-versus-buy model compared a $2.20 fully loaded purchased cost per pack with a $0.40 complete in-house manufactured cost.
02$594K/yearAt the model's annual volume of 330,000 packs, the calculated annual cost difference was $594,000.
03$4.752M / 8 yearsThe same model calculated a $4.752 million cost difference over eight years.

Historical cost-model calculation.

01
Situation

Operating context

PPI was purchasing cryotherapy gel-pack capability externally and had an opportunity to bring formulation and pack production in-house to improve control and support the broader FirstICE product platform.

02
Challenge

What made the work difficult

The decision required separating raw-material cost from complete manufactured cost, transferring a process into internal operations, acquiring equipment and materials, and scaling production without exposing proprietary formulation details.

03
Dean's role

Responsibility and authority

Dean led the operating side of the make-versus-buy decision and the insourcing program, including internalization priorities, cost analysis, manufacturing integration, and implementation governance.

04
Actions

How the work moved forward

  1. Led the make-versus-buy decision to internalize cryotherapy gel-pack manufacturing.
  2. Coordinated formulation, raw-material, equipment, personnel, and process requirements for the transfer.
  3. Integrated the new capability into regulated medical-device manufacturing operations.
  4. Established cost tracking that distinguished purchased cost from internally manufactured economics.
  5. Connected the insourced capability to the broader FirstICE product platform.