PPI North Facility Acquisition, Renovation & Manufacturing Expansion

Executive operating leadership for the acquisition, rehabilitation, plant relocation, and startup of a 20,000-square-foot industrial facility converted into additional medical-device manufacturing capacity.

Results

Results and contributions.

0120,000 sq ftPPI acquired the industrial property by November 5, 2012 and converted it for medical-device manufacturing.
02May 31, 2013The physical relocation to PPI North was completed May 31, 2013.
03Facility startup completedThe facility entered operation with active inventory and ERP-supported warehouse operations by June–July 2013.
04$17,159Walton County reports document $17,159 in PPI tax abatements across FY2016–FY2023 following the local development incentive.
01
Situation

Operating context

PPI needed additional manufacturing capacity and acquired a nearby 20,000-square-foot former roofing-tile plant that had been vacant for years and was in major disrepair.

02
Challenge

What made the work difficult

The project had to turn a neglected industrial shell into a working medical-device manufacturing facility. Rehabilitation, utilities, safety, security, networking, warehouse flow, production layout, equipment integration, and the physical move all had to be coordinated.

03
Dean's role

Responsibility and authority

As General Manager and COO, Dean led key planning and operational-integration work. He connected manufacturing, warehouse, material-handling, equipment, staffing, technology, and move requirements to facility layouts and formal project plans. Acquisition, construction, trades, equipment installation, and relocation were shared efforts with company leadership, employees, vendors, utilities, contractors, and public entities.

04
Actions

How the work moved forward

  1. Integrated facility rehabilitation with manufacturing, warehouse, equipment, utilities, safety, security, networking, and operating-flow requirements.
  2. Developed and revised facility and production-line layouts to support equipment placement, storage, material handling, and production flow.
  3. Used formal project planning to coordinate the plant transition and operating dependencies.
  4. Coordinated the operating side of the facility expansion with company teams and local-government stakeholders.